News & Bulletin Updates

8Indian Petrochem analysts have reported a cut in HDPE ( F5400) prices in Ahmedabad

Read more

8Ahmedabad witnessed a price drop in liquid chlorine, offering some relief to industries reliant on this versatile solvent

Read more

8The domestic market for caustic soda flakes in Mumbai has witnessed a sharp price increase today, driven by tightening product availability

Read more

8Indian Petrochem analysts have reported a cut in Methyl Ethyl Ketone (MEK) prices in the Mumbai imported market

Read more

8Mixed xylene (MX) prices have risen in Mumbai today. On November 6, 2024, mixed xylene (MX) prices in imported repack bags in Mumbai were quoted higher from Rs.79/Kg to Rs.80/Kg, registering a hike of Re 1/kg

Read more

8Track the domestic prices and identify if there are any changes today

Read more

8A combination of factors is at work, get the latest price here

Read more

8Has the price witnessed a movement today?

Read more

8Find out the latest prices

Read more

8Find out the price trend

Read more

8Has the price witnessed a movement today?

Read more

8The global price index includes trends from the previous month, however, the price moved today in multiple regions

Read more

8Find out the latest prices here, including trends over the past month

Read more

8The latest prices for N-Butanol in SE Asia

Read more

8Has the price witnessed a movement today, Find out by how much

Read more

8Get the latest prices here including trends over the past month

Read more

8Have the prices for Phenol moved today? find out

Read more

8Find out the latest prices for Acrylonitrile in world

Read more

8The prices have witnessed a movement today. Find out how much

Read more

Converting a Vis Breaker unit into a Crude Distillation unit is an expensive process
8But this refinery is trying to see if it can be done
8It does not want the constraints imposed by the main equipment in the Vis Breaker unit to be removed
8The scope was refined to include the preparation of a high-level equipment list with design conditions, dimensions, and material specifications for new or modified items. CPCL also indicated that their standard template would be provided for cost estimation purposes.
8It was clarified that only a high-level payback time estimation is required, based on capital expenditure, operating expenses, and sales revenue, without the need for a detailed financial analysis.
But the fact that bid date has been extended several times means that everyone is struggling with what CPCL wants to do

Read more

8Project Name: Raisen, Shajapur and Sehore Districts City Gas Distribution
8Project Cost: Rs 300 crore Click here for more details

Read more

8Project Name: Mirzapur, Chandauli and Sonbhadra Districts City Gas Distribution
8Project Cost: Rs 250 crore Click here for more details

Read more

Get to know what IOCL's total gas network building work matrix for the coming year is all about
8It is a network of 1500 km
8So that is a lot of work coming up for vendors, get a detailed outlay of these plans

Read more

What do these companies have in common?
8Aarthi Oil And Gas Exploration Services Private Limited
8Advent Oilfield Services Private Limited
8Agarwal Marketing & Services (Energy) Private Limited
8D.S.Geo Services Private Limited
8J P Singhal & Company
8Mahaabala Geo Private Limited
8Navrang Energy Geoservices LLP
8S.K. Petro Services Private Limited

Read more

Phosphoric acid/Sulphuric acid Greenfield Project
8Cost: Rs.1000 Cr.
8Project Event: The project is currently advancing through the early construction and detailed engineering stages. The detailed engineering study is in progress and is anticipated to be completed by February 2025. The release of the Request for Quotation (RFQ) for the Lump Sum Turnkey (LSTK) contractor is expected in the first quarter of 2025.
DAP/Phos Acid Greenfield Project
8Cost: Rs. 54 Cr.
8Project Event: The terms of reference proposal have been approved, and the application for environmental clearance is expected to be granted by April 2025. The Request for Quotation (RFQ) for the local contractor is anticipated to be issued in the second quarter of 2025.

Read more
« First  « 548 549550 551 552 »  Last
Showing 13725 - 13750 of 92346 Bulletin