Bulletin Updates

This is a compliance-led contest as much as a technical one. – Downstream contracting briefs: Technical bids, 2 Jan 2026

Jan 02, 2026

1) Technical bids draw five-way contest for IOCL greenbelt HDD crossings at Paradip

Five bidders have surfaced in the technical stage for a corridor-constrained HDD package where “golden joints” and rock execution risk sit quietly inside the scope.

2) Technical bids open with five admitted bidders for refractory shutdown maintenance package

This is a compliance-led contest as much as a technical one.

The full story is for subscribers. Log in to read it, or start a free trial.
Log in Start a free trial »