Bulletin Updates

Refinery cracker: Owner reshapes catalyst cost rules and utility design envelopes – 26 Nov 2025

Nov 26, 2025

Techno-economic clauses are modified and they change how catalyst, co-catalyst and adsorbent costs will be modelled across operating cycles.

Design pressures for critical steam and boiler-feed utilities have also been upgraded, tightening licensor design obligations.

Training load, hydrogen purity tables and BEDP deliverable definitions have been simultaneously clarified, signalling a sharper evaluation framework.

The full story is for subscribers. Log in to read it, or start a free trial.
Log in Start a free trial »