Bulletin Updates
E&P contracting brief for the day – 29 Oct 2025
Oct 29, 2025
1) ARC to harden rig PCR electronics uptime without EMD in ONGC MBA Basin8ONGC MBA Basin has floated a limited two-bid ARC to keep rig PCR AC/DC modules and PCB cards in fighting shape.
EMD is deleted, but PBG and strict e-submission discipline remain.
A tenure mismatch in the booklet could sway bid prices unless clarified.
2) Telemetry-policed CSS hire puts steam quality and move clocks into pay math in ONGC Mehsana8ONGC wants a mobile steam-generator package that sustains ≥90% steam quality at 150 kg/cm² and 342 °C through nine CSS cycles.
The contract wires hourly penalties, zero-charge windows, and RTMS LDs directly into operating day rates.
Mobilization caps and 7-day move clocks now decide who can execute at scale.
3) Throughput-first ATC and tighter SOW wording sharpen yard delivery for SRP rods in ONGC Ahmedabad Asset8ONGC has pared back scope language and hardened schedule/accountability for servicing 25,000 pulled-out sucker rods.
The corrigendum drops explicit SMG replacement, fixes the 150-day delivery phrasing and overlays a weekly throughput floor with separate recoveries.
The cash and security rails stay firm, pushing bidders to prove pace and paperwork, not just price.
4) Bid end moves to 11 November 2025; technical and compliance spine remains intact in Oil India Baghewala drilling services8OIL has pushed the bid clock but not the bar.
The curve-to-TD toolchain and call-out regimes remain as-is, with hard rules on vintage, calibration, and mobilisation.
The extra days are for compliance depth, not scope dilution.
Log in Start a free trial »

