Bulletin Updates

BPCL Mumbai refinery’s NHGU and SRU power-recovery turbines lock 15-month delivery, curve-based PGTR and 33-month risk tail – 15 Oct 2025

Oct 15, 2025

BPCL is bidding for twin steam power-recovery packages that convert PRDS losses into electrical output. The scope is tightly engineered—from API-class hardware to ABB-supervised 6.6 kv protection—and acceptance is pinned to performance curves at actual steam states. The bars are high on PQC and on cash-security, and a small time anomaly in pre-bid could still trip the unprepared.

The full story is for subscribers. Log in to read it, or start a free trial.
Log in Start a free trial »