Bulletin Updates

E&P contracting brief: Part II – 9 Oct 2025

Oct 09, 2025

1) GST raised to 18%, mobilisation LDs tightened, bid pushed to 23 October in Oil India’s Kerala-Konkan Tier-1 OSR8Oil India has baked a mid-cycle GST hike into its Kerala-Konkan Tier-1 spill-response tender while locking ATC precedence and quantified mobilisation LDs.

The bid date moves to 23 October, giving vendors room to align IACS certifications, stock, and Kochi manpower.

But the two-hour emergency readiness, vintage caps, and a hard option clause will still filter the field to pre-positioned specialists.

2) Tender timeline pushed by one day for civil works at CB-ONN-2005/9 & 2005/38Corrigendum-1 extends the bid due date to 09 October 2025 and aligns opening on 10 October 2025.

No commercial or technical relaxations accompany the shift.

The move preserves “critical” classification discipline while offering bidders tactical breathing room.

3) Bid closing and technical opening shifted to 16 October with calibrated liability and payment tweaks8OIL has moved bid closing and opening to 16 October 2025, extending the runway without loosening PQC or mobilisation discipline for the Drilling Directional Wells with RSS-SDMM plus MWD-LWD plus Jar including Mud Services tender.

Annexure-A1 quietly reshapes two pressure points: downhole loss depreciation and consortium payment routing.

The balance tilts toward cleaner execution and marginally lower risk pricing, with governance rails intact.

4) Bid window pushed to 23 October with targeted scope and design edits in OIL Jorhat CBG plant8OIL has moved the EPCOM bid gate to 23 October with same-day technical opening.

Corrigendum-5 also strips out blanket 130% over-design and cleans up municipal interfaces while fixing a 30% factor of safety at pre-feed.

The signals point to comparability and constructability without loosening the commercial spine.

The full story is for subscribers. Log in to read it, or start a free trial.
Log in Start a free trial »