Bulletin Updates

A limited, two-part e-bid with a three-month validity has drawn three handlers into PLL’s… – Downstream contracting briefs: Technical bid, 7 Oct 2025

Oct 07, 2025

Material handling works-2 locks in logistics discipline under a uniform percentage -over-SOR model at Dahej PP plant

A limited, two-part e-bid with a three-month validity has drawn three handlers into PLL’s PDH-PP logistics frame. The owner keeps evaluation tight with a pre-filled SOR and strict EMD/CPBG rules. Delivery risk shifts to bidders through manpower/MHE availability and cradle-to-yard documentation.

The full story is for subscribers. Log in to read it, or start a free trial.
Log in Start a free trial »