Bulletin Updates
A limited, two-part e-bid with a three-month validity has drawn three handlers into PLL’s… – Downstream contracting briefs: Technical bid, 7 Oct 2025
Oct 07, 2025
Material handling works-2 locks in logistics discipline under a uniform percentage -over-SOR model at Dahej PP plant
A limited, two-part e-bid with a three-month validity has drawn three handlers into PLL’s PDH-PP logistics frame. The owner keeps evaluation tight with a pre-filled SOR and strict EMD/CPBG rules. Delivery risk shifts to bidders through manpower/MHE availability and cradle-to-yard documentation.
Log in Start a free trial »

