Bulletin Updates

IOCL scraps HCU pre-fractionator tender – 30 Sep 2025

Sep 30, 2025

A late-June RA-bound completion package at LuPech has been pulled after two quick deadline extensions. The scope was classic brownfield closure — structural/piping/electrical/I&C with full loop checks — under a six-month clock. No cancellation memorandum is present in the tender PDFs, leaving reasons unspecified in the document.

The full story is for subscribers. Log in to read it, or start a free trial.
Log in Start a free trial »