Bulletin Updates
E&P contracting brief: Part III – 26 Sep 2025
Sep 26, 2025
1) ONGC fixes strict no-subcontract stance and live-line experience bar for Anklav Tee hot tapping in Cambay Asset8A live-line double stoppling at Anklav Tee will decide how many bidders are truly equipped for hydrocarbon hot taps.
Ongc’s EMD/PBG flex helps liquidity but its no-subcontract rule and ten-year experience test keep the bar high.
The evaluation will likely reward firms with in-house stopple heads and documented completions.
2) Mobilisation relaxed, steel policy added, and TPI proof mandated in slickline hire8Owner has eased the start-line but tightened the paperwork.
Mobilization shifts to 120 days while a national steel-compliance form and a TPI attestation become bid gates.
The net impact on bidder pool, schedule risk, and field diagnostics will surprise some readers.
3) OIL extends CT/N2 well-servicing GeM bid to 06 October 2025 in Oil India Limited8OIL has pushed the bid deadline for its CT/N2/FPU stimulation package to 06 October 2025.
The scope and safety envelope remain unchanged while the buyer reiterates an amended ATC pack.
The extra time may widen participation but will not soften penalty or readiness discipline.
4) ONGC pushes Assam MPPU bid to 01 October 2025, tweaks mixing/displacement tanks8ONGC has extended its Assam MPPU tender to 01 October 2025.
The corrigendum trims batch-mix capacity but formalizes displacement tanks and simplifies the console.
Bidders get time, but availability and penalty discipline remain unchanged.
5) OIL pushes 1000 HP mobile rig bid to 08 October 2025 with ATC reaffirmed8OIL has moved the bid deadline by 34 days to 08 October 2025.
The technical bar and mobilization discipline remain unchanged even as pre-bid minutes and ATC are published.
The shift is designed to widen compliant participation, not to soften specifications.
Log in Start a free trial »

