Bulletin Updates
PFCUU revamp: Bypass valve and logic revamp to lift PRE stability – 23 Sep 2025
Sep 23, 2025
The revamp flagged a quantified flow increase that could push its PRE beyond current comfort limits. A new bypass trim valve and control-logic revamp are on the table, with a tight 58+4 week delivery window. Controls integration inside the existing system concentrates commissioning risk on software change quality and interlock validation. Bidders with proven Dresser-Rand/E-148 logic experience will carry an edge. The financial gate and missing cash-security terms set up a telling RFQ round.
Log in Start a free trial »

