Bulletin Updates

E&P contracting brief: Part II – 17 Sep 2025

Sep 17, 2025

ONGC gives bidders 20 extra days but keeps hard specs and ATC guardrails in APU hire for Ankleshwar8The APU tender clock moves to 23 September 2025 without any visible dilution of specs or terms.

Vendors get breathing room to line up API-monogrammed iron, inspections, and bank instruments.

ONGC’s ATC and “follow tender condition” replies signal that the bar stays high.ONGC grants 20-day extension but keeps option clause and probity stack tight in plunger lift systems multi-asset buy.8The bid clock moves to 22 September 2025. Vendors get time to align OEM papers, PPP-MII proofs, and buyer QA slots. signalling time for quality — not dilution.Sub-contracting barred and mobilization eased as bid clock shifts in ONGC HPHT DDW1/PLQP offshore IRC.8ONGC has hardened accountability at DDW1/PLQP by prohibiting sub-contracting while easing mobilization to a 60-day yard setup.

Staged payments and a logistics grace window rebalance cash-flow and LD exposure without diluting performance.

Whether the bid end moves to 23 September 2025 is still not evidenced in the published pack.

The full story is for subscribers. Log in to read it, or start a free trial.
Log in Start a free trial »