Bulletin Updates
OIL races Hasimara fix with trenching, 48-hr shutdown – 1 Sep 2025
Sep 01, 2025
Oil India has moved a single-packet GeM buy to bury and armour three exposed lines at Hasimara.
The SOW forces a 48-hour hook-up with two teams and hot-standby gear, plus 100% radiography and 1.25× hydrotests.
A firm-price, no-advance regime and a 1% mobilization penalty will narrow the field to shutdown-ready EPCs.
Log in Start a free trial »

