Bulletin Updates

Tier-1 trio eyes ONGC drilling rentals under tighter OEM – 1 Sep 2025

Sep 01, 2025

The Mehsana package demands OEM-validated motors, dual-set redundancy, and tighter liability for non-retrievable MWD.

A cost-plus channel for bits, with ONGC selecting OEMs, changes how ROP risk and lead-time are managed.

With date extensions now locked, watch how AlMansoori, Halliburton, and Schlumberger price standby density and fishing cover.

The full story is for subscribers. Log in to read it, or start a free trial.
Log in Start a free trial »