Bulletin Updates

OIL holds firm on high-spec rig package after pre-bid – 29 Aug 2025

Aug 29, 2025

The pre-bid minutes show OIL saying yes to integrity and safety, and mostly no to capex-light shortcuts.

Electrical top drive, three pumps, and buffer tank stay non-negotiable.

The calendar gets more breathing room, but the spec envelope does not

The full story is for subscribers. Log in to read it, or start a free trial.
Log in Start a free trial »