Bulletin Updates
ONGC’s PLQP–OGT 20-inch pipeline corrosion survey in HPHT asset: L2 bidder’s quote was 147.2% higher – 27 Aug 2025
Aug 27, 2025
ONGC has awarded its difficult-to-pig 20-inch PLQP–OGT multiphase lin.
The price spread to L2 is an eye-popping 147.2%, pointing to sharply different risk or method assumptions.
The payoff sits in how strictly ONGC enforces SP0116 deliverables—and what the post-assessment does to MOAP and inhibitor strategy.
Log in Start a free trial »

