Bulletin Updates
ONGC push/pull tug charter: pre-bid replies tighten schedule, correct PBG clock, and narrow scope – 27 Aug 2025
Aug 27, 2025
The big asks were time and cash — bidders wanted a longer runway and a lighter guarantee.
ONGC refused both, but quietly fixed a clause that shaved risk for banks and vendors.
The scope got sharper too, dropping DP and anchor handling to widen the fleet pool without loosening policy levers.
Log in Start a free trial »

