Bulletin Updates

Flare Package scope for Dahej tender: Ambiguity prevails – 31 Jul 2025

Jul 31, 2025

Mandatory hydrotesting, lighting scope, and downgraded design pressure signal late-stage engineering shifts. And yet a some critical points were left answered.

The full story is for subscribers. Log in to read it, or start a free trial.
Log in Start a free trial »