Pre-bid meetings are yet to be conducted for the civil works package(lot-1) – Software update: Power projects, 27 Oct 2022
Oct 27, 2022
Rs 2000 crore greenfield hydroelectric Power project: Civil works package( lot-2) in January 2023
EIA/EMP report has been approved by MoEF.
Hydrology report has been approved by CWC
Consent of PPA as per CERC tariff has been obtained.
Pre-bid meetings are yet to be conducted for the civil works package(lot-1)
RFQ for the civil works package (lot-2) is likely to be floated in January 2023.
Rs 5535 crore greenfield pumped storage project: S/S works in Q1 2023
Forest clearance stages 1 and 2 have been accorded by the DFO.
CEA has approved the DPR of the project
Contractor have been selected for civil, HM and EM work.
Site preparation has been completed for the P/S works.
RFQ for the 400kV S/S works is likely to be floated in Q1 2023.
Rs 11350 crore brownfield super-critical thermal power project: Ball mill system package in December 2022
The project got delayed due to the slow progress in design and drawing by the contractors.
BOP works are in the advanced stage of completion
Civil works for railway siding have been completed.
RFQ for the ball mill system package is likely to be floated in December 2022.