Bulletin Updates

Software update: Power projects; Megha in race for Civil works package – 13 Oct 2022

Oct 13, 2022

Rs 6000 crore greenfield multipurpose project: Pre-bid awaited for civil works package (Lot-2)

Forest clearance stage 2 has been granted by the MoEF.

The hydrological report has been approved by the Ministry of Water Resources

Bidding is in progress for the civil works package (lot-1). Get the names of the bidders here. Megha Infrastructure & Engineering is one of them

Pre-bid meetings are yet to be conducted against the tender for the civil works package(lot-2)

RFQ for the HM works package is likely to be floated in December 2022

Rs 3200 crore greenfield hydroelectric project: PMC selected

GSI has approved the geotechnical investigation and topographical survey.

The hydrology report has been approved by the CWC.

Modification of DPR is in progress as per the revised e-flows parameter.

Forest clearance stage-1 and stage-2 are pending at the regional office.

PMC has been selected for the project. Find out who it is.

RFQ for the Civil works package(Lot-1) for the main plant is likely to be floated in Q1 2023.

Rs 125.5 crore construction of 765 KV Transmission line: Conductor package in November 2022

Land acquisition has been completed at all the locations of the transmission line

Erection and fabrication of lattice towers are in the advanced stage of completion.

Contractor have been selected for S/S and P/S works.

RFQ for the ACSR moose conductor package is likely to be floated in November 2022.

Construction work delayed in Rs 10500 crore greenfield thermal power expansion project: Chlorine dosing system in November 2022

PG test has been completed for BTG.

Civil works have been completed for the Railway siding.

Sub-contractor has been selected for the absorber system.

Construction works have been delayed due to a steel price hike, and a dispute between the sub-vendor and EPC.

RFQ for the Chlorine dosing system package is likely to float in November 2022.