Bulletin Updates

Forest clearance stage -1 is pending at the nodal office. – Software update: Power projects, 5 Sep 2022

Sep 05, 2022

Rs 75 crore construction of 400 kV Transmission line: EPC package for a T/L in October 2022

Forest clearance stage -1 is pending at the nodal office.

Detailed surveys and investigations have been completed.

The soil test has been completed for the transmission line

RFQ for the EPC package for transmission line works is likely to be floated in October 2022.

Rs 376 crore greenfield gas power project: DM plant package in Q4 2022

The EC of the project has been approved by the MoEF.

The fuel requirement is proposed to be met from the proposed GAIL LNG terminal.

The diesel requirement is proposed to be met from IOCL's existing oil depot.

The bid evaluation is in progress for the NDCT package.

RFQ for the DM plant package is likely to be floated in Q4 2022.

Rs 700 crore greenfield hydroelectric project: Civil work package(lot-1) in Q4 2022

The PPA was signed between the developer and the Government.

The state PWD department has completed the construction of the approach road up to the dam site.

The hydrological study has been completed and the report was approved by CWC.

The preparation of DPR is in progress and it is in the advanced stage for completion.

PMC was selected for the project.

RFQ for the civil work package(lot-1) is likely to be floated in Q4 2022.