Bulletin Updates

RFQ for the EIA/EMP consultant is likely to be floated in September 2022. – Software update: Power projects, 11 Jul 2022

Jul 11, 2022

Rs 132 crore Construction of 132 kV S/C on D/C transmission line: RFQ Ahead

Land acquisition was completed for substation work and detailed engineering is in progress.

Forest clearance stage 1 was completed and stage 2 is pending at the DFO. 8RFQ for 132/33 kV P/S works is likely to be floated in August 2022

Rs 4000 crore greenfield hydroelectric power project

Application for FC submitted and wildlife clearance is pending.

RFQ for the EIA/EMP consultant is likely to be floated in September 2022.

Rs 900 crore greenfield hydroelectric power project

EIA consultant was selected.

Everain Global Services has prepared the Biodiversity Impact Assessment report

The drilling and drifting works are expected soon.

Rs 5000 crore greenfield thermal power project

The owner has signed for long-term coal linkage with coalfields.

Pilling and foundation works were completed and civil, and structural works are in progress.

The wagon tripler package was awarded

The stacker reclaimer package is likely to be floated in September 2022.