RFQ for the EPC package for T/L works is likely to be floated in July 2022. – Software update: Power projects, 20 Jun 2022
Jun 20, 2022
Rs 120 crore construction of 220 KV DC T/L line: EPC package ahead
Detailed survey and investigations are in progress and soil investigations were completed at the site.
Private land acquisitions are in progress for the transmission line.
RFQ for the EPC package for T/L works is likely to be floated in July 2022.
Rs 3000 crore extension greenfield pump storage project: RFQ Ahead
TOR was approved by MoEF&CC
EIA consultant selected. (Click on Details for more on the consultant)
Survey activities for hydrological, geological, and aquatic life are in progress.
RFQ for the drilling and drifting works is likely to be floated in August 2022.
Rs 4766 crore greenfield pumped storage project: RFQ ahead
Forest clearance stage-1 is pending at the regional office.
EIA consultant selected (Get who were L-1, L-2 and L-3).
Geotechnical investigation and topographical survey have been completed.
The public hearing is likely to be held in July 2022.
Rs 12000 crore super-critical thermal power expansion project, (Stage-III): BOP sub-contract RFQs ahead
Civil and structural works are in progress at the BTG site
Pilling works were completed for the NDCT package and civil works are in the initial phase of construction.
Find out who are the major contractors involved in the project.
CW system package is likely to be floated in Q3 2022