Bulletin Updates
Prabha Energy aims at 1 mmscmd of gas – 14 Dec 2021
Dec 14, 2021
Prabha Energy aims to produce 1 mmscmd of gas within "2-3" years from its CBM field
That is a lot of production by any yardstick
849 wells have been drilled, and 33 have been put on de-watering
The advantage of the block is it is just 60 km from the Urja Ganga pipeline
Log in Start a free trial »

