Bulletin Updates
DSF Round: Availing processing capacity may turn out to be a head ache – 1 Sep 2021
Sep 01, 2021
In the Discovered Small Fields round, a big headache could well be the availability of processing facilities for the oil and gas produced.
Any spare processing capacity available with OIL or ONGC is subject to adequacy check study of future loads at the existing facilities
The problem could well be that low production will not justify setting up facilities on one's own, or what is produced will have to ferried further out for processing
Investors must take note
Log in Start a free trial »

