Bulletin Updates

Swan LNG tie-ins: Regulator calls for a discussion – 28 Jul 2021

Jul 28, 2021

The tussle over a tie-in connectivity between GAIL and GSPL from the Swan LNG terminal means there are two applications for tie-ins from the same terminal

And the regulator wants to call an open house on this to resolve the issues involved

The full story is for subscribers. Log in to read it, or start a free trial.
Log in Start a free trial »