Bulletin Updates

Project Event: The feasibility studies are still ongoing, RFQ in April 2021 – Software update: Fertilizer projects, 19 Mar 2021

Mar 19, 2021

Ammonia-Urea Energy Saving Project 8Cost - Rs 250 crore

Project Event: The feasibility studies are still ongoing, RFQ in April 2021

Natural Gas Firing System Greenfield Project 8Cost - Rs 15 crore

Project Event: RFQ for the Design Engineering Manufacturing Inspection Testing Packing Supply Erection Commissioning of NG Firing System with RLNG for Utility Boiler II has been out and the bid due date is 29 March 2021.

The full story is for subscribers. Log in to read it, or start a free trial.
Log in Start a free trial »