News & Bulletin Updates

May 30, 2022: Silver at high rates

On May 30, 2022, the Mumbai market witnessed a rise in silver prices.

Read more

Petrochem sources from Mumbai have reported a rise in gold prices.

Read more

A strong regional demand has contributed to the price rise.

Read more

Ni≥22% nickel sulfate prices registered a sharp rise in the market of Delhi.

Read more

A significant hike inglycerine prices in the Delhi market was recorded today.

Read more

Petrochem sources reported a significant fall in hard foam polyether prices in the Ahmedabad market.

Read more

An increase in dichloroethane prices has been noted in Mumbai today.

Read more

On May 30, 2022, Petrochem sources reported a fall in butyl acrylate prices at the Kandla market.

Read more

A robust demand has lifted tetrachloroethylene prices in the Delhi market.

Read more

A fall in diisobutyl phthalate prices in the domestic market of Ahmedabad was noticed on May 30, 2022.

Read more

On May 30, 2022, the Kandla port witnessed a rise in styrene prices.

Read more

Non-ionic surfactant prices were assessed lower in the domestic market of Mumbai.

Read more

On May 30, 2022, Petrochem sources reported a fall in MEG prices in the Mumbai market.

Read more

Phosphoric acid prices in the Ahmedabad market have fallen sharply.

Read more

Thiamethoxam 98% prices have gained in the Delhi market.

Read more

A sharp cut in acetamiprid 97% prices was announced in the Mumbai market today.

Read more

Imidacloprid 97% prices were much lower in the Ahmedabad market today.

Read more

A robust demand has lifted acetic acid prices in the Mumbai market.

Read more

Ammonia Storage Tank Greenfield Project
8Cost: 100 Cr.
8Project EventThe procurement of long-lead items is still ongoing. Construction is likely to be started at the end of June 2022 due to a delay in the purchase. Toyo engineering is the single bidder for the 10000 MT double-wall supply with associated facilities on an EPCC- LSTK basis. The project is likely to be commissioned in Q2 FY 2023-2024.
DAP Expansion Project
8Cost20 Cr.
8Project Event: Due to a delay in the evaluation, the environmental clearance is still under process, which is likely to be elicited at the end of July 2022. RFQ for the LSTK contractor is likely to be released in August 2022

Read more

There is a greenfield LPG bottling plant
8Find out who the EPCM is
8Also who is the contractors involved
8What kind of RFQs are ahead
Kandla- Viramgam-Gandhinagar-Sanand LPG pipeline
8Get an update here on what is up
Paradip-Hyderabad Product Pipeline Greenfield Project
8The pipeline faced stiff ROW protests
8Find out when is commissioning due
Koyali-Ahmednagar-Solapur Product Pipeline Expansion Project
8Get an update on this Rs 2000 crore project
Get in touch with us to gain access to this database

Read more

Rs 660 MW thermal unit under construction: Get the list of contractors you can sell equipment and services to
The third 660 MW thermal power plant is to be commissioned in 2024
8Get a list of contractors involved here, including some sub-contractors. May be you can you can sell some equipment and services to them.
8Also what kind of RFQs are still ahead on this one
Rs 12000 crore pumped storage project: Get a contact list here
8Land acquisition is in progress
8PFR consultant has been hired
8Preparation for the DPR tender is in progress
Get some contact names here
Rs 9000 core pump storage plant: EPC package in July 2022
This is a standalone pump storage project (Rs 9000 crore)
8Geo-technical investigation and a topographical survey were completed at the site. Drilling and drifting activities were completed. Private land acquisition is in progress and the first phase was completed and phase-2 is yet to start.
8Preparation of DPR is in progress and Aravee Associates is preparing the report for the same.
8Preparation of tender is yet to start for the EPC package. Further bids are expected soon.
8RFQ for the EPC package for Civil and HM package is likely to be floated in July 2022.
Khurja Greenfield Super Thermal Power Project: Latest update   
Khurja Greenfield Super Thermal Power Project     
8Commissioning date is 2024
8Most packages have been awarded
8But the Separator system package is likely to be floated by Q3 2022 by BHEL
Speak to us about accessing these projects

Read more

8India’s top oil and gas producer ONGC on Thursday said it will invest Rs 31,000 crore over the next three years in exploring the Indian sedimentary basin for fuel reserves which could augment the nation’s production in its attempt to be self-reliant in the energy sector.

Read more

8SGX Nifty futures were up by 0.76 per cent to 16,461 indicating a positive start for the Indian market on Monday, May 30.

Read more

8State-owned Oil India Ltd on Friday reported its highest-ever quarterly net profit in the three months to March as it got nearly USD 100 per barrel price for oil produced and sold. Net profit at Rs 1,630.01 crore in January-March was almost double of Rs 847.56 crore profit in the same period of last year, OIL Director (Finance) Harish Madhav told reporters here.

Read more

8With the uncertainty of privatisation behind it, the staterun Bharat Petroleum Corporation Ltd (BPCL), is embarking on increasing its petrochemical capacity, a company official said.

Read more
« First  « 2312 23132314 2315 2316 »  Last
Showing 57825 - 57850 of 94916 Bulletin