8Get the latest rubber prices in Singapore
Read more
Get the daily updates for
8Chemicals
8Crude
8LNG
8Fertilizers
8LPG
8Ammonia
Read more
Oil India Ltd has been in more controversies than ever before.
8Is there something dramatically amiss with the top brass, headed by Sushil Chandra Misra, of Oil India Ltd?
Read more
Oil India Ltd's purchase of five 2000 HP drilling rigs has been decided
8But it wasn't without some drama
Read more
8This defaulting pipeline operator has been given one last chance
Read more
8Essar Bulk Terminal Limited (EBTL) is an-all weather, deep-draft terminal which is located on the mouth of Tapi estuary along the western side of Hazira peninsula in Gulf of Khambhat, under Magdalla Port of Gujarat Maritime Board (GMB)
8Why were the ratings were withdrawn?
Read more
LNG imports are down dramatically
8And so is total gas availability in the country
Read more
Usually, when a pipeline is laid, capacity utilization levels remain low.
8And that is one reason why pipeline operators are not keen to lay fresh lines in an almost virgin hinterland.
8But the Urja Ganga pipeline will notch up a high utilization level from the very beginning
Read more
LPG carrier rates have seen a sudden spurt.
8What has caused this upswing?
8Also, the recycling ship industry is in doldrums
8LNG rates have climbed higher too
Read more
The Vadinar SPM complex is a peculiar case.
8The cart went before the horse
8And clearly, the project is delayed
Read more
Know more about of the Kochi - Salem Greenfield LPG Pipeline Project (KSPL)
8Land acquisition is an issue
Read more
8Mundra - Panipat Greenfield Crude Oil Pipeline (IOC)
8Some more contracts have been awarded
Read more
8This defaulting pipeline operator has been given one last chance
Read more
8What is the real discount at which Russian oil is selling in the market?
Read more
Concentrated Nitric Acid Greenfield Project
8Cost: 50 Cr.
8Project Event: A consultant is appointed for the preparation of a Detailed Feasibility Report (DFR). The report preparation is still ongoing. RFQ for the LSTK contractor is likely to be released at the end of July 2022, Due to a delay in the DFR preparation.
GSSP/GBSSP/GZSSP/GPG/BSP/BSG Expansion Project
8Cost:48 Cr.
8Project Event: The proposal for the term of references has been granted, the final EIA report preparation is still ongoing. Proposal for environmental clearance is likely to be submitted in Q2 FY 2022-2023. RFQ for the LSTK contractor is likely to be released in Q2 FY 2022-2023
Read more
A fall in ethylene glycol monobutyl ether prices in the domestic market of Ahmedabad was noticed on June 1, 2022.
Read more
On June 1, 2022, Delhi witnessed a rise in dimethyl sulfoxide prices.
Read more
A fall in diethanolamine prices at Nhava Sheva was recorded on June 1, 2022.
Read more
EPDM grade 6405 prices have escalated in the Mumbai market, today.
Read more
Petrochem sources reported a significant fall inadipic acid prices in the Ahmedabad market.
Read more
Petrochem sources have reported a huge fall in NPG prices in the Mumbai market.
Read more
Petrochem sources in Delhi have reported a rise in isophthalic acid prices.
Read more
Chrome oxide prices registered a hike in the Mumbai market.
Read more
Aluminum plate (1060-1.2* 1250*2500mm) price in the Mumbai market was announced today.
Read more
Copper plate prices have moved much higher in the metal market of Ahmedabad.
Read more