8A weekly outlook for mixed xylene is carried here
8Find out how prices are going to behave ahead
Read more
8Find out our weekly analysis, price charts and projections on ethyl acetate price movements for the coming week
Read more
8We are carrying here a weekly carbon black market report
8Find out what kind of prices are projected going ahead
Read more
8The website carries here a weekly outlook on BPA prices
8Find out what our analysts are saying about how prices will behave till next week
Read more
Cyclohexanone prices registered a sharp rise in the imported market of Chennai.
Read more
Dimethyl sulfoxide prices have moved upwards in the Delhi chemical market, today.
Read more
Ethylene glycol monobutyl ether prices are slowly decreasing in the Kandla market.
Read more
Dioctyl adipate prices were assessed higher in the chemical market of Ahmedabad.
Read more
Diisobutyl phthalate prices were assessed lower in the domestic market of Mumbai.
Read more
A significant fall in lead oxide 99% prices was recorded in Delhi today.
Read more
A significant hike in polystyrene sheet prices in the Mumbai market was recorded today.
Read more
22% nickel sulfate prices were assessed lower in the metal market of Mumbai.
Read more
Phosphoric acid prices in the Delhi market have fallen sharply.
Read more
Ortho-xylene prices were pushed higher in the Ahmedabad market today.
Read more
MEG prices in the Mumbai market registered a sharp fall today.
Read more
On June 20, 2022, Petrochem sources confirmed that phthalic anhydride prices have sharply fallen in Kolkata.
Read more
Petrochem sources have confirmed a fall in acetic acid prices in the Mumbai market.
Read more
8Why is this US E&P tool manufacturer blacklisted and related outfits exempted?
Read more
India will need much less urea when these two units go into production, and two additional cargoes of LNG will be needed every month to handle the demand from these units
Ammonia-Urea Brownfield Project
8Cost: 6000 Cr.
8Project Event: The bid due date for the Cooling Tower as well as Cooling Water Treatment Package has been extended from 6 June to 7 July 2022. The bid due date has been extended from 17 May to 30 May 2022 for the Supply, Installation & Testing of the Flare System. The Tender for Instrument Air & Plant Air System has been canceled due to higher price quoted by the L1 bidder than the estimated cost, The L1 bidder was Linde. BTL EPC, Macawber Beekay & Tata Project are in the race for the supply of Urea handling & baggage packages on an LSTK basis, The technical bid opening is in progress.
Ammonia-Urea Brownfield Project
8Cost: 6000 Cr.
8Project Event: Comt Construction Private Limited is the L1 bidder for the Sheeting Cladding in Wagon Loading Platform with price bid INR 2,99,62, 250. RFQ for the additional Dryer has been out and bid due date is 29 June 2022. 96 % of construction work has been completed, and the equipment installation is ongoing, Machinery orders are already completed, procurement of other services is ongoing, also pre-commissioning is ongoing, Commercial production is likely to be started from September in place of June 2022, due to delay in the construction.
Read more
On June 20, 2022, Petrochem sources reported a fall in tetrachloroethylene prices in the Ahmedabad market.
Read more
Butyl acrylate prices gained Kandla in anticipation of tight supply crunch and improved buying sentiments
Read more
A significant hike inadipic acid prices in the Mumbai market was recorded today.
Read more
Rs 120 crore construction of 220 KV DC T/L line: EPC package ahead
8Detailed survey and investigations are in progress and soil investigations were completed at the site.
8Private land acquisitions are in progress for the transmission line.
8RFQ for the EPC package for T/L works is likely to be floated in July 2022.
Rs 3000 crore extension greenfield pump storage project: RFQ Ahead
8TOR was approved by MoEF&CC
8EIA consultant selected. (Click on Details for more on the consultant)
8Survey activities for hydrological, geological, and aquatic life are in progress.
8RFQ for the drilling and drifting works is likely to be floated in August 2022.
Rs 4766 crore greenfield pumped storage project: RFQ ahead
8Forest clearance stage-1 is pending at the regional office.
8EIA consultant selected (Get who were L-1, L-2 and L-3).
8Geotechnical investigation and topographical survey have been completed.
8The public hearing is likely to be held in July 2022.
Rs 12000 crore super-critical thermal power expansion project, (Stage-III): BOP sub-contract RFQs ahead
8Civil and structural works are in progress at the BTG site
8Pilling works were completed for the NDCT package and civil works are in the initial phase of construction.
8Find out who are the major contractors involved in the project.
8CW system package is likely to be floated in Q3 2022
Get in touch with us for more on these projects
Read more
Petrochem sources reported a significant fall inlauric acid prices in the Delhi market.
Read more
A cut in C9 petroleum resin (used in traffic paint) was noted in the Ahmedabad market today.
Read more