News & Bulletin Updates

8The company has appointed a new CFO who brings 24 years of experience with him

Read more

8Such adhesive gels not only reduce the pain of dressing changes
8High-strength adhesive products are also suitable for fixing sensors and medical aids

Read more

China is the largest Carbon Black market with about 25% market share.
8The US is a follower, accounting for about 15% market share

Read more

Deep Plast Industries produces masterbatches that find their application predominantly in the plastic and packaging industries.
8Find out more about how the company is doing

Read more

8Get the latest rubber prices for Singapore

Read more

8The plant has a proposed capacity of 4500 MTPM and will also produce an additional 1500 MTPM of Titanium Dioxide

Read more

8Get a comprehensive global review of the fertilizer market

Read more

8Join the discussion group

Read more

Leveraging technological advancement at the subsidiaries, Rossari is working on several new chemistries and launching various new products.
8Falling raw material prices have provided the company with the necessary cushion to aid improvement in operating margins
8However, the management is still cautious in taking any long-term decision regarding RM inventory stock-up

Read more

8The company is taking back tires that may have sustained bead damage due to a warehouse de-palletizer

Read more

8Malaysia shares experience in Islamic finance to develop a sustainable ecosystem at COP27

Read more

8The Japanese rubber market seems to have extended its losses

Read more

8The benzene market is expected to reach USD 75 billion by 2027

Read more

8Find out cost analyses and benefits of different eco-friendly transformation methods

Read more

8Under the partnership, the companies will produce shoe soles using rubber by-products

Read more

8Find out useful insights regarding the market size, demand, share and forecasts for the rubber market

Read more

8The new vice-president was earlier the director of Michelin Europe

Read more

Lyvelli Lignite Corporation Ltd's lignite to methanol project is the cynosure of all eyes.
8Find out why it is creating a ripple
But there are confusing signals coming out.

Read more

LNG imports are lower in October than in the same month last year
8But much costlier

Read more

Here is E&P professional responsible for the quickest monetization of an oil field in India
8The field was taken over in October 2021, workover started in January, and gas was ready for sale in that month itself

Read more

The NRL refinery expansion comes for a solid Rs 28,000 crore
8The company has been taken over by Oil India Ltd
8But how exactly is NRL's capex funded
And when it the refinery coming on stream?

Read more

Here is a comprehensive write-up, the best in recent times, on the global fertilizer industry
8And where it is headed
8And what corrective steps are needed t be taken

Read more

How is the global urea market behaving?
8What is the situation in India, with the NFL tender?

Read more

Both these fertilizer units have been inaugurated by the Prime Minister but some contracting is still on.
8Cost: Rs 6000 Cr.
8Project Event: RFQ for the HURL township has been extended from 26 September 30 November 2022. RFQ for Road drain and culvert work has been extended from 7 September to 21 September 2022 . Bid due date for the additional Dryer unit has been extended from 29 June to 25 August 2022, due to a lack of bidders. The production at the complex has been started in Feb 2022 with 60 % of the production capacity, Prime Minister already inaugurated the complex in December 2021. The construction of the railway line is not completed yet.
Ammonia-Urea Brownfield Project 
8Cost: Rs 6000 Cr. 
8Project Event : The commercial production of neem-coated urea started on 9 November 2022 at 60 % of capacity. RFQ for Sindri HURL township has been out and bid due date extended from 26 September to 30 November 2022

Read more

Rs 21400 crore  greenfield super thermal power project stage-1: Absorber system package in December 2022
8Erection of SG work has been delayed due to multiple leakages from the reheater tube.
8Re-tendering is yet to be started for the SG package.
8RFQ for the absorber system package is likely to be floated in December 2022.
Rs 11150 crore greenfield pumped storage project: Civil works package in Q1 2023
8The forest clearance stage 1 has been granted but stage 2 is pending at the nodal office
8PMC has been selected for the project.
8RFQ for the civil works package is likely to be floated in Q1 2023.
Rs 11500 crore greenfield pumped storage project: HM works package in Q1 2023
8EC, FC, and WL clearance have been obtained.
8The bid evaluation is in progress for EM works.
8RFQ for the HM works package is likely to be floated in Q1 2023
Rs 350 crore construction of 400 KV D/C project: T/L work in December 2022
8Approval from PTCC, Civil aviation, and defense have been granted.
8Erection and installation of substations are in progress.
8Bid evaluation is in progress for the P/S works.
8RFQ for the T/L work is likely to be floated in December 2022.
Get in touch with us for more on these projects

Read more
« First  « 2039 20402041 2042 2043 »  Last
Showing 51000 - 51025 of 94991 Bulletin