News & Bulletin Updates

8The Delhi chemical market reported a firm trend in wet slurry prices this week

Read more

8The Ahmedabad market has recorded an increase in the prices of EVA (18%) today, after a period of stability

Read more

8September 4, 2025, saw a rise in Mumbai domestic intact anionic surfactant prices

Read more

8The price of mixed xylene (MX) in the Mumbai market experienced an upward movement today, attributed to slight fluctuations in supply and demand and rising raw material costs.

Read more

8Project Name: Dahej-Vagra District City Gas Distribution
8Project Cost: Rs 350 crore Click here for more details

Read more

8Project Name: Amreli District City Gas Distribution
8Project Cost: Rs 250 crore Click here for more details

Read more

8Here's what's happening today in the E&P, midstream-downstream, and CGD section

Read more

8Reliance Industries is seeking to modernize its PTA plant and ramp up LAB capacity at Patalganga, with a slate of new petrochemicals and by-products. The Rs.150-crore project, promises to boost domestic supply while staying within existing site boundaries and environmental norms.

Read more

8PLL’s vessel tender tightens the screws on both price discovery and execution discipline. Heavy BQC and NDA-gated licensor data will narrow the field to a few proven fabrication houses. Moving fully assembled, nitrogen-blanketed vessels cuts commissioning risk. It lifts routing, permitting and carrier constraints. Expect premiums for safe handling of internals. Also, The BQC asks for ≥58 mm plate or ≥4.32 m diameter with ≥14.4 m TL-to-TL. And it must be within the last five years. That filters to a shortlist of heavy fabricators.

Read more

8Technically, the crossing set (eight HDDs, including a ~1.3 km long shot and a hill crossing of ~1.1 km) demands high-end rigs, robust mud systems, and contingency drill strings (≥150% length ready on site)—a bar the IFB codifies through equipment and inspection requirements. This materially narrows the credible vendor pool, explaining BPCL/EIL’s tolerance for multiple extensions to preserve competitiveness.

Read more

8The tender at Pata now runs on two e-tender IDs with the guarantee ring-fenced. Site PGTR has been quietly taken off the table even as delivery stays at 10 months. Four bid-date pushes add 47 days — but the entry barriers haven’t moved.

Read more

8BPCL and EIL have flatly denied bidder requests for PTR relaxations, phased commissioning, and softer HSE rules. Contractors face mandatory supplementary cathodic protection obligations and strict safety audits. The entry barrier is higher than comparable tankage tenders, signalling a deliberate vendor pool narrowing.

Read more

BPCL’s Bina petchem expansion seeks 47 process GCs with five-year post-commissioning cover
8Bpcl has opened a high-bar analyser tender that forces bidders to prove shelter-mounted GC experience on complex hydrocarbon projects. A licensor-driven NDA and multi-year maintenance in base scope tilt the field toward serious OEMs and tight integrator partnerships.The tender fuses licensor IP controls with long-horizon O&M, reflecting petchem operational realities. If it lands smoothly, expect replication across analyzer and control packages. Vendors that industrialise this model will gain durable advantage.
NRL Dabidubi BOP pushes bid due with addendum-driven scope and safety resets — Numaligarh Refinery Expansion Project
8NRL has granted an extension after issuing a dense technical addendum. The shift from SIL3 to SIL2 and new scope on roads/drains will change bid math. The real story is how these edits redistribute risk between integration and civil quantities.

Read more

8PNGRB awards for excellence in CGD and NGPL network: 2025 [PNGRB]
8Public notice on timely submission of performance bank guarantee (PBG) by authorized CGD entity [PNGRB]
8Public consultation to declare IOCL’s Guwahati-Siliguri petroleum products pipeline (GSPL) as common or contract carrier [PNGRB]
8Public consultation to declare IOCL’s Koyali-Ahmedabad petroleum products pipeline (KAPL) as common or contract carrier [PNGRB]
8Public consultation to declare IOCL’s Haldia-Barauni petroleum products pipeline (HBPL) as common or contract carrier [PNGRB]
8Public consultation to declare IOCL’s Haldia-Mourigram-Rajbandh petroleum products pipeline (HMRPL) as common or contract carrier [PNGRB]
8Public consultation to declare IOCL’s Mathura-Delhi petroleum products pipeline (MDPL) as common or contract carrier [PNGRB]
8Public consultation process to declare IOCL’s Panipat-Delhi petroleum and petroleum products pipeline (PDPL) as common carrier or contract carrier under section 20 of the PNGRB Act, 2006 [PNGRB]
8Public consultation to declare IOCL’s Mathura-Agra-Gawria petroleum products pipeline (MAGPL) as common or contract carrier [PNGRB]
8Public consultation to declare IOCL’s Panipat-Rewari petroleum products pipeline (PRPL) as common or contract carrier [PNGRB]
8Public consultation to declare IOCL’s Panipat-Bhatinda petroleum products pipeline (PBPL) as common or contract carrier [PNGRB]
8Public consultation to declare IOCL’s Koyali-Dahej petroleum products pipeline (KDPL) as common or contract carrier [PNGRB]
8Public consultation to declare IOCL’s Koyali-Ratlam petroleum products pipeline as common or contract carrier [PNGRB]
8Public consultation to declare IOCL’s Mathura-Bharatpur pipeline (MBPL) as common or contract carrier [PNGRB]
8Public consultation on declaring IOCL’s Paradip-Somanthpur-Haldia pipeline as common or contract carrier [PNGRB]
8Public consultation on IOCL’s Haldia-Barauni pipeline declaration under PNGRB Act, 2006 [PNGRB]
8Guidelines for handling of boil-off gas [PNGRB]
8Annual report 2024-2025 [AES]
8Annual report 2024-2025 [Alphageo]
8Annual report 2024-2025 [SWP]
8Annual report 2024-25 [IGL]

Read more

It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days.
Get the daily updates for :
8LNG
8Crude
8Chemicals
8Fertilizers
8LPG
8Ammonia
8All tankers
8Bulk and Dry cargo

Read more

8Business responsibility and sustainability report for the FY 2024-25 [FACT]
8Web-link of the annual report for the financial year ended 31st March, 2025 [MMTC]
8ESG rating by Crisil ESG Ratings and Analytics Limited [Bayer]

Read more

8Analyze the price fluctuations over the past few days to determine if there have been any changes

Read more

8Compare the prices to see if there have been any changes over the last few days

Read more

8Analyze the price fluctuations over the past few days to determine if there have been any changes

Read more

8Get the prices for Methylene Dichloride, Chloroform, Tetrachloroethylene, Dichloroethane and Dichloropropane

Read more

8How much have the prices of alcohol products changed since yesterday? Find out

Read more

8Find more about the recent pricing changes for all the Refrigerant products and how much it has moved

Read more

8Compare prices to identify any changes

Read more

8Find out the most recent prices for Caustic Soda Lye and Caustic Soda Flake

Read more

8Analyze the price fluctuations in the Indian domestic market over the past day to determine the magnitude of any change

Read more
« First  « 13 1415 16 17 »  Last
Showing 370 - 395 of 89821 Bulletin